Mandate

Vinge advises Polar Structure AB in connection with its issuance of EUR 81 million senior secured notes through a majority owned subsidiary

Vinge advises Polar Structure AB, a leading developer and owner of infrastructure, in connection with its issuance of EUR 81 million senior secured notes through a majority owned subsidiary. The proceeds will be used to finance the construction of a railway outside Boden, which will connect the existing iron ore line (Sw. Malmbanan) with H2 Green Steel’s new facility for large-scale production of green steel at Boden Industrial Park.

The notes have a fixed interest rate, a tenor of 6.5 years and are secured by pledges in, inter alia, the railway assets.

Vinge’s team primarily consisted of Niclas Winnberg and Kristoffer Larson (Real Estate), Helena Göransson, Karl-Gustaw Tobola, and Josef Groow (Banking & Finance), and Filippa Bergkvist (Transaction Support).

Related

Vinge advises Infranity in connection with the acquisition of Nordic Re-Finance AB

Vinge has advised Infranity, a private equity firm specializing in infrastructure investments, in connection with its acquisition of a majority stake in Nordic Re-Finance AB, a Scandinavian locomotives lessor. The acquisition brings ambitious development plans for Nordic Re-Finance AB, including expansion into new geographical areas.
January 20, 2025

Vinge advises Platzer in conjunction with the sale of a school property in Gothenburg

Vinge has advised Platzer Fastigheter AB in connection with the sale of a school property situated in Södra Änggården, Gothenburg. The property, which was sold as a corporate transaction, has a value of SEK 552 million. The sale is part of Platzer's strategy to develop and optimise its property portfolio.
January 17, 2025

Vinge advises Qben Infra in connection with issuance of senior, unsecured bonds and early redemption

Vinge has advised Qben Infra AB in connection with its issuance of senior, unsecured bonds in an amount of SEK 500,000,000 (within a framework of SEK 600,000,000) and the parallel early redemption by its subsidiary ININ Group AS in respect of its previously issued senior secured bonds due 2027.
January 16, 2025